Welcome to the official HUAFEI ANHE website!
Local:Home > News >

Anhe Signed EPC Contract for Tomuan HPP in Indonesia

date:2024-09-24 14:55

        At 11:30 a.m. local time (Western Indonesian Time) on September 23, 2024, our company successfully signed the EPC (Engineering, Procurement, and Construction) contract for the Tomuan HPP 14.6MW hydropower project in Indonesia. At the signing ceremony, Mr. Hadisan, Chairman of PT IZMI POWER, and Mr. Zhou Yuefei, Chairman of our company, attended and witnessed this significant moment together. Both parties also reached a consensus on long-term cooperation for future projects.
        The Tomuan Hydropower Station is located upstream of the Aek Niagara River in Pematang Siantar, North Sumatra Province. The station is 178 km from Medan, approximately 145 km from Silangit Airport, and about 53 km from the nearest county town.The geographic coordinates of the dam site are 2° 42'23.60" N and 99° 85'6.60" E, while the powerhouse site is located at 2° 43'4.80" N and 99° 84'0.80" E. The power station has a catchment area of 109.4 km², a reference flow rate of 6 m³/s, a design head of 280.5 meters, and an installed capacity of 14.6 MW.

 
 
 

Both parties are signing the EPC Contract documents .

        As the 9th hydropower project our company has signed in the Indonesian market, the Tomuan Hydropower Station fully demonstrates our strong professional capabilities and influence within the hydropower EPC sector. It also represents the alignment of our shared vision and values with those of our partners. We are keenly aware that this success could not have been achieved without the trust and support of the project owner, nor without the hard work and dedication of our colleagues.
        Looking to the future, our company will continue to adhere to the principle of "strengthening and expanding partnerships." We are committed to working hand in hand with PT IZMI POWER with even greater enthusiasm and a rigorous approach to ensure the successful implementation of the Tomuan project, injecting fresh momentum into the development of both companies.

 

                                                                                               Source : Marketing Department
                                                                                               Editor: General Affairs Department

Previous:The Tunnel of STMT II Station’s has Reached a New High Recor
Next:Signing Construction Engineering 84MW HPP Kelantan, Malaysia